关于梅山连拱坝结构稳定性问题的探讨(韦港)
#trs_autoadd_1224032428437 {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
#trs_autoadd_1224032428437 p {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
#trs_autoadd_1224032428437 td {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
#trs_autoadd_1224032428437 div {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
#trs_autoadd_1224032428437 li {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
/**---json--
{"":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"p":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"td":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"div":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"li":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"}}
--**/
【摘要】梅山大坝建成运行数十年来,历经了20世纪60年代、70年代、80年代和90年代的多次除险加固,目前仍在进行新一轮的险除加固。梅山连拱坝传递荷载的型式具有桥墩式结构特征,但又远比桥墩式荷载更为复杂。特别是两岸坝肩垛基(支墩地基),地形上具备向下游和河床两个方向的位移临空空间;垛基岩体中存在倾向河床方向的缓倾角结构面和顺河走向陡倾裂隙,构成了垛基双向滑移的边界条件。更为特别的是,垛墩(桥墩)直接建于斜坡岩体之上,并未进行必要的嵌入式结构处理,部分垛墩与地基呈阶梯式接触,建筑物与地质体之间的连接表现为既可以转动又可以移动的可动铰支座型式,从而构成了大坝结构稳定性的重大隐患。1962年发生右岸坝基位移导致坝体裂缝已经足以说明以上缺陷的存在事实。认识到该工程出险的本质原因,工程加固才是可靠的。
【关键词】梅山大坝 除险加固 结构稳定 连拱坝 超静定
1 前言
梅山大坝以其独特的坝体结构型式而闻名于世,并被收录入水工建设物教科书。梅山大坝又以其运行期间的坝基错动渗水成为国内著名的病险大坝,令后人为此进行除险加固而绞尽脑汁费尽心机。更为令人称奇的是,大坝属于设计十分先进的轻型空间高次超静定结构,但却在没有计算机的20世纪50年代,完全靠拉计算尺这样的手工劳动完成了设计任务,并将大坝顺利建成,这在大坝设计史上并不多见。自然,当年的大坝设计者们荣登当今设计大师宝座,成为我等小字辈工程技术人员的追星偶像,确属当之无愧。
笔者求学时对梅山大坝略有所知,在其后的工
关于梅山连拱坝结构稳定性问题的探讨(韦港)
点击下载
本文2010-03-12 14:57:04发表“农林鱼水论文”栏目。
本文链接:https://www.damishu.cn/article/151289.html
您需要登录后才可以发表评论, 登录 或者 注册
最新文档
热门文章