浅析工程建设设计阶段的造价控制(毛菊生)

栏目:农林鱼水论文发布:2010-03-12浏览:2763下载203次收藏
  #trs_autoadd_1234920899671 { margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体 } #trs_autoadd_1234920899671 p { margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体 } #trs_autoadd_1234920899671 td { margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体 } #trs_autoadd_1234920899671 div { margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体 } #trs_autoadd_1234920899671 li { margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体 } /**---json-- {"":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"p":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"td":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"div":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"li":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"}} --**/

引 言

  

我国的工程建设程序可划分为六个阶段:即顶目建议书阶段,可行性研究阶段、设计文件阶段、建设准备阶段、建设实施阶段、竣工验收阶段。其中的设计文件阶段就是指工程设计阶段(它分为初步设计和技术设计两个阶段),工程设计就是指对建设工程实施的计划和安排,决定建设工程的轮廓与功能,从我国的建设程序看,工程设计阶段在整个工程建设中起到承上启下的作用,一个工程将来能否达到既安全,又满足功能要求,能否取得最佳经济效益,在设计阶段就己经定型了。长期以来,在我国工程建设领域一提“设计”,则自然想到技术设计,是设计人员的责任;一提造价控制,那自然是概预算人员的职责。多年以来的实践表明,单凭概预章人员,单纯地从财务角度审核费用开支,是难以有效地控制造价的。通常我们只重视施工阶段的造价控制,而忽略其它阶段的造价控制,是很片面的。工程顶目的投资控制与管理,应当贯穿于工程建设的全过程,根据西方国家的有关专家学者分析,设计费一般只相当于建设工程全寿命(包括工程造价和工程交付使用后的经常开支性费用)的1%以下,但正是这小于1%的费用对工程总投资的影响度占75%以上。另外统计资料表明,在设计阶段节约投资的可能性为88%,而施工开始后节约投资的可能性仅为12%。很显然,工程投资的控制关键在于施工前的投资决策和设计阶段,而在项目做出投资决策后,控制工程总投资的关键在于设计阶段。本文首先对设计阶段工程造价失控的原因进行分析,然后对如何在设计阶段有效控制造价进行了论述。

 

一、设计阶段工程造价失控的原因

 

1.初步设计阶段造成的工程造价失控

 

(1)主要表现在前期可

解锁后支持完整在线阅读或下载编辑海量优质内容资源

浅析工程建设设计阶段的造价控制(毛菊生)

点击下载
分享:
热门文章
    确认删除?
    回到顶部