北京西四环暗涵工程中的建设管理(樊博)

栏目:农林鱼水论文发布:2010-03-12浏览:2637下载171次收藏
  #trs_autoadd_1228793643484 { margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体 } #trs_autoadd_1228793643484 p { margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体 } #trs_autoadd_1228793643484 td { margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体 } #trs_autoadd_1228793643484 div { margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体 } #trs_autoadd_1228793643484 li { margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体 } /**---json-- {"":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"p":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"td":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"div":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"li":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"}} --**/

摘要:西四环暗涵工程作为南水北调中线北京段的控制性工程先期开工建设, 在工程建设过程中,业主不断总结管理经验、提高管理水平, 制定了一系列切合工程实际的管理制度, 保证了工程建设的顺利实施。

 

关键词:南水北调 西四环暗涵 建设管理

 

中图分类号tv511 文献标识码b 文章编号1673- 4637( 2006) 06- 0049- 03

 

1 工程概况

 

南水北调中线北京段工程起点房山北拒马河, 终点颐和园团城湖, 全长80.4 km。北京段总干渠共划分为10 个单位工程, 分别为北拒马河暗渠工程、惠南庄泵站工程、pccp 管道工程、西甘池及崇青隧洞工程、大宁调压池工程、永定河倒虹吸工程、卢沟桥暗渠工程、西四环暗涵工程、团城湖明渠工程、铁路和地铁交叉工程等。

 

西四环暗涵工程是穿越北京市城区的大型建筑物,为南水北调中线干线北京段工程的控制性工程之一。工程起点位于丰台区大井村西, 终点位于海淀区大潮市场, 暗涵沿西四环主路北上, 穿越五棵松地铁车站及铁路大台支线, 全长12.64 km。工程由1.40 km 长2孔3.8 m×3.8 m 明挖施工方涵、0.185 km