北京密云水库第一溢洪道抗滑稳定分析(彭淑芳)
#trs_autoadd_1229928239968 {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
#trs_autoadd_1229928239968 p {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
#trs_autoadd_1229928239968 td {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
#trs_autoadd_1229928239968 div {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
#trs_autoadd_1229928239968 li {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
/**---json--
{"":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"p":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"td":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"div":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"li":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"}}
--**/
摘要:监测发现第一溢洪道实测扬压力高于设计值, 为分析设计水位下第一溢洪道闸首的抗滑稳定性, 对1996 年至2005 年库水位153.6 m 至130.4 m 下的测压管水位进行了系统整理分析, 建立测压管水位与库水位的相关函数。采用2000 年颁布的《溢洪道设计规范》中抗剪断强度公式, 建立抗滑稳定模型, 进行分析。
关键词:密云水库 建筑物 运行分析
中图分类号tv698.2+32 文献标志码a 文章编号1673- 4637 ( 2007) 06- 0037- 04
密云水库是首都北京唯一的地表饮用水水源地,同时承担着下游京津冀地区防洪任务。确保密云水库防洪、供水工作安全意义重大。
第一溢洪道是密云水库主要的泄水建筑物, 其溢流堰底坎高程低、承担的水压力大、设计泄量大、底坎以上蓄水量大。3 座溢洪道中, 第一溢洪道距离潮河主坝最近, 调流坎距离潮河主坝约1 000m, 在水库的防洪调度中, 其泄洪次序在其他2 座溢洪道之后,是保证主坝保安全的重要建筑物。第一溢洪道安全与否, 能否正常发挥挡水、泄水作用, 直接关系着水库安全蓄水、正常泄洪。
2006 年密云水库汛限水位提高到152.0 m 运行,2007 年底南水北调工程将引河北省水进京, 作为首都的战略水资源地, 密云水库在较高水位运行的机会增大。对存在安全隐患的第一溢洪道进行计算分析,弄清工程的运行状况, 在低水位条件下采取措施很有必要。
1 第一溢洪道工程基本情况
1.1 工程概况
密云水库第一溢洪道位于潮河黄各庄南分水岭上,为水库宣泄洪水的主要建筑物之一。工程为Ⅱ级建筑物, 按100 a 一遇洪
北京密云水库第一溢洪道抗滑稳定分析(彭淑芳)
点击下载
本文2010-03-12 14:58:03发表“农林鱼水论文”栏目。
本文链接:https://www.damishu.cn/article/151356.html
您需要登录后才可以发表评论, 登录 或者 注册
最新文档
热门文章